We are using Puhos Laminated Weather Dek 2 for the flooring. |
|
.This flooring has a green laminated surface which helps proteect
the floor from the elements. |
|
The boards are t & G and we have glued them and nailed them
with ring nails then taped the joints. Once all work is completed
we can remove the laminate and the floor underneath will be in good
condition. |
|
The chippies are laying out where the walls will be going so we
can make any last minuate alterations |
|
Building the walls then putting them in place. |
|
Putting the walls in place. |
|
Stud walls for bedroom in place. |
|
Putting in boards to fix plasterboard to. |
|
Boards to fix plasterboard to. |
|
Incerting door linings in the framework. |
|
Building wardrobes. |
|
Fixing door linings to the blockwork. |
|