We are using Puhos Laminated Weather Dek 2 for the flooring.
.This flooring has a green laminated surface which helps proteect the floor from the elements.
The boards are t & G and we have glued them and nailed them with ring nails then taped the joints. Once all work is completed we can remove the laminate and the floor underneath will be in good condition.
The chippies are laying out where the walls will be going so we can make any last minuate alterations
Building the walls then putting them in place.
Putting the walls in place.
Stud walls for bedroom in place.
Putting in boards to fix plasterboard to.
Boards to fix plasterboard to.
Incerting door linings in the framework.
Building wardrobes.
Fixing door linings to the blockwork.