We are using LaFarge 12.5mm Firecheck for all the ceilings
and many of the walls. Hopefully taking care not to trap any wires. |
|
The slope in the ceiling makes it more difficult to put up the boards.
|
|
Progress on screwing up plasterboards on the ceiling is fairly quick. |
|
We are packing the cavity of the walls with insulation for sound
insulation. |
|
Plasterboard on the stud walls with cavity fill insulation. |
|
Using our Abru access tower we are able to secure the plasterboard
and make ready for the plastering. |
|
Putting bonding compound on the walls |
|
Putting the plasterboard to the block walls |
|